logo

Menu

  • Home
  • About
  • Upcoming Trips
  • Past Trips
  • Photos
  • Contact
ifmga ABTOT Membership Number 5657

Recent Posts

  • Lesotho
  • Finnmark in May
  • Bergsfjord Late Spring
  • Japanese Haute Route – The Final Cut
  • Dômes de Miage

Archives

  • September 2026
  • May 2026
  • March 2026
  • January 2026
  • November 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • February 2024
  • January 2024
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • March 2020
  • January 2020
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • November 2017
  • April 2017
  • February 2017
  • January 2017
  • November 2015
  • September 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • September 2014
  • June 2014
  • April 2014
  • March 2014
  • February 2014
  • January 2014
  • September 2013
  • May 2013
  • April 2013
  • March 2013
  • February 2013
  • January 2013
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • September 2011
  • May 2011
  • April 2011
  • March 2011
  • February 2011
  • January 2011
  • November 2000

Categories

  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Archive For September 15, 2024

Japanese Haute Route 3

Japanese Haute Route 3

Ken Fujikawa had skied the Japanese Alps from Murodo to Kamikochi before.  His record-setting, twenty-hour traverse, was fuelled by 20 Powergels and one and a half litres of water.  He and Kei Karino were supporting our attempt at the traverse but this time there was nothing fast nor light about it.  No records were in sight which is just as well as their rucksacks weighed in at a back-breaking 22 kilos whilst mine was a mere 16.

We took seven days to cover a slightly longer, 95km route with about 7000m of vertical gain.  I’d made the journey in 2008 and again in 2009 but had completely forgotten how tough it is.  Day one was one of the hardest with 14 hours on our skis to reach the Sugo Nokkoshi hut whilst the easiest day was a mere seven-hour affair.  It was hard going but everyone rose to the challenge, finishing the journey with smiles and sense of humour intact!

Good weather is essential, and we were lucky.  Despite the packs and the arduous nature of the terrain it was pure joy travelling on skis with the moon and then the rising sun each morning.  Just wonderful.

3776m Mt Fuji was our final objective which I had tried on three previous occasions only summiting once.  Was the success rate to increase to 50%?  For our ascent the sun shone, the wind held off yet again and the snow was perfect.  No ice, no boot crampons required.  There was considerably less snow than in 2008 but what was there was excellent, allowing fast, easy skinning to the summit and great skiing on the way down.   The beers and pizza on the shores of Lake Yamanakako rounded the day off in style.

 

DSC04528 c12d8124-1941-46e7-9a7f-30a43e71fc62 DSC04568 a81f6ccf-9a13-447f-94ab-c804d074db69 IMG 3294 DSC04533 c08bc880-b988-4b2e-8341-d2108fc3bed3 DSC04835 4cde5cb6-5b14-4303-a328-6171c8c1f1a1 c93c8770-2499-420a-9e0e-134c9d49c96f DSC04506 b7c20a27-f551-4b19-b4d7-1bc4ec3734d0 DSC04670 DSC04724 f7be2c1a-a98e-4a11-ae03-e60d960a1214 DSC04480 ebc62aa3-3f04-4b2a-ab52-9e320797463b IMG 3307 cac60062-8085-450b-a9f8-1c28ee09d58a DSC04591 DSC04783 IMG 3463 DSC04740 IMG 3214 DSC04736 DSC04514 IMG 6376 DSC04494 IMG 3616 IMG 3292
« ‹ 1 of 2 › »

Copyright © 2025 Jim Blyth.