logo

Menu

  • Home
  • About
  • Upcoming Trips
  • Past Trips
  • Photos
  • Contact
ifmga ABTOT Membership Number 5657

Recent Posts

  • Lesotho
  • Finnmark in May
  • Bergsfjord Late Spring
  • Japanese Haute Route – The Final Cut
  • Dômes de Miage

Archives

  • September 2026
  • May 2026
  • March 2026
  • January 2026
  • November 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • February 2024
  • January 2024
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • March 2020
  • January 2020
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • November 2017
  • April 2017
  • February 2017
  • January 2017
  • November 2015
  • September 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • September 2014
  • June 2014
  • April 2014
  • March 2014
  • February 2014
  • January 2014
  • September 2013
  • May 2013
  • April 2013
  • March 2013
  • February 2013
  • January 2013
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • September 2011
  • May 2011
  • April 2011
  • March 2011
  • February 2011
  • January 2011
  • November 2000

Categories

  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Archive For May 18, 2025

Peru 17 minutes

Peru 17 minutes

If our day on 5469m Mariposa Sur in the Cordillera Vilcanota were a play it would be written in classic dramatic form comprising five acts with no intermission.

Act I – our intrepid ski tourists ascend to the glacier accompanied by an arriero, his two children and a mule.  The mule does the heavy lifting until it can go no further at which point the man and his children shoulder the burdens.  Duration 3 ½ hours

Act II – Skins on and roped together the skiers wind their way upwards through heavily crevassed terrain in an afternoon snow and graupel storm.  The suspense builds as thunder is heard and visibility reduces.  Can they continue?  Will they be forced to turn back?  Duration 1 ½ hours

Act III – Through the cloud an almost impregnable wall of snow appears.  There is no option but to don boot crampons and shoulder skis.  Steeper and steeper the terrain becomes with the chances of success diminishing with every step.  Just as hope is about to die the slope eases, the cloud lifts and the summit appears.  Our skiers vanquish the final narrow ridge and the top is reached.  What little breath they have is taken by the views.  Skins off.  Duration 1 hour

Act IV – An exhilarating descent of pure ski joy on five-star hero snow sees our skiers back at the bottom of the glacier.  This is by far the shortest act in the play.  Duration 17 minutes

Act V – The Walk Out.  A long, tedious descent back to camp with very heavy packs.  The play ends with tired but happy skiers dining on chicken and rice before collapsing into sleeping bags.  Duration 2 ¼ hours

The ratio of down to up is never great in ski touring with places such as Peru at the extreme end of the scale.  However, as we all know, it’s not just about the skiing.  Taking skis to Peru and skiing four 5400 – 5500m peaks and some subsidiary summits was part of a fabulous adventure.

 

IMG 0989 DSC07030 IMG 0679 IMG 0758 DSC07075 IMG 1022 IMG 1103 IMG 0793 IMG 0933 IMG 1186 IMG 0927 IMG 0809 IMG 0530 IMG 0640 IMG 0829 IMG 0524 IMG 0783 IMG 0787 IMG 0608 IMG 0619 IMG 0457 IMG 0444 DSC07133 IMG 0434 DSC07090 IMG 0421 DSC07048 HSNXE7060 DSC07072 IMG 0511
« ‹ 1 of 2 › »

Copyright © 2025 Jim Blyth.